On the third floor of the Qingyuan Radio and Television Station building in Qingcheng District, Qingyuan, the space was originally an unfinished floor with a ceiling height of approximately 11 m and a total area of about 890 m². It had a concrete floor, exposed services, and a full-height glass curtain wall along one side. Beginning in September 2024, the space underwent a complete transformation from design to system delivery. In April 2025, Guangzhou Saijia Acoustics & Lighting Engineering Co., Ltd. won the contract for the “Qingyuan Radio and Television Station 400 m² Variety Show Studio Procurement Project (Decoration, Lighting, Audio, Acoustics and Stage Machinery Systems).”
View More
At Collins Place in Queens, New York, an international Chinese-language media organization with more than three decades on air brought the sound, lighting and stage machinery for its new news production center together in one procurement and installation project. Three spaces were completed on the same floor: an approximately 300 m² multimedia studio, an approximately 120 m² cooking-show recording studio, and an approximately 300 m² multipurpose black-box theater. The project was commissioned by SinoVision U.S. Chinese Television and undertaken by Guangzhou Saijia Acoustic & Lighting Engineering Co., Ltd., which was responsible for the studio acoustic fit-out and the procurement and installation of lighting equipment.
View More
In Baiyun Xincheng, Baiyun District, Guangzhou, the 95-mu educational facilities project for Phases 5–8 of Baiyun Xincheng delivered an 11-meter-clear-height gymnasium for the Baiyun Campus of Peiying Middle School. The venue includes a basketball competition area, badminton courts, a fitness room and table tennis rooms. China Construction Eighth Engineering Division Corp., Ltd. served as the general contractor, while Guangzhou Saijia Acoustic & Lighting Engineering Co., Ltd. undertook the specialist fit-out subcontract covering three spaces: the auditorium, gymnasium and tiered classroom.
View More