Radio Live Broadcast Zone Acoustics: Huzhou

Views: 208     Author: Saijia Acoustic     Publish Time: 2026-11-19      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
Reddit sharing button
Threads sharing button
sharethis sharing button

Huzhou Radio and Television Station Media Center Radio Studio Area Acoustic Renovation and TV Lighting Project: From Its Origins to the Present


In Huzhou, Zhejiang Province, the radio studio area of a long-serving broadcast technology building underwent a comprehensive renovation. Four types of technical rooms—live broadcast studios, recording studios, directing rooms and control rooms—received new architectural acoustic treatments, while the television lighting and suspension systems were designed in detail and installed as part of the same construction phase. The project was commissioned by Huzhou Radio and Television Station and undertaken by Guangzhou Saijia Acoustics & Lighting Engineering Co., Ltd. Construction began on May 22, 2015 and was completed on December 8, taking approximately 200 days. Work was carried out inside an operating broadcasting building without interrupting broadcasts. Following the timeline from design and pre-construction preparation through key construction stages, completion and acceptance, this article reviews the project using the award notice, design renderings and completed-site photographs, providing a reference for organizations planning to build or renovate radio studios, recording studios and television studios.


1. Project Profile: Key Facts at a Glance

1.1 Project Overview

Project Item

Details

Project Name

Huzhou Radio and Television Station Media Center Radio Studio Area Acoustic Renovation and TV Lighting Project

Project Location

Huzhou, Zhejiang Province, China

Building Location

Third Floor, Broadcast Technical Rooms, Building 1, Media Center

Client / Procuring Entity

Huzhou Radio and Television Station

Contract Period

May 22, 2015 to December 8, 2015; approximately 200 days

Contractor

Guangzhou Saijia Acoustics & Lighting Engineering Co., Ltd.

Scope of Work

Architectural acoustic renovation of the radio studio area (live broadcast studios, recording studios, directing rooms and control rooms); television lighting and suspension systems; and electrical works, including integrated cabling and power distribution, across six subsystem work packages

Key Construction Features

Room-specific acoustic design; acoustic breaks, sealing and matched sound-insulation assemblies; three-primary-color soft lighting and constant-force suspension rods; construction inside an operating broadcasting building without interrupting broadcasts

Design / Construction References

GY/T 5086-2012, GY 5045-2006, GY 5022-2007, GB 50303-2015 and other broadcasting and building standards


Three points in this project record deserve particular attention. First, the schedule: approximately 200 days, under firm budget and timeline constraints typical of a broadcasting facility renovation. Second, the scope: architectural acoustics for four types of technical rooms, television lighting and suspension systems, as well as power distribution and integrated cabling—all coordinated by one contractor, representing an integrated acoustic, lighting and electrical delivery model. Third, the construction conditions: because the building remained operational, high-noise work could not interfere with daily broadcasting. Regarding the floor location, the source-material folder is labeled “fourth and fifth floors,” but the award notice, technical briefings and construction documentation consistently identify the project as the “third-floor broadcasting technical facilities” project. This article follows the construction records.


1.2 From Broadcast Technical Rooms to an Acoustic Renovation Project

The project was driven by Huzhou Radio and Television Station's need to upgrade the broadcast technical rooms in Building 1 of the Media Center. The existing live broadcast studios, recording studios, directing rooms and control rooms no longer met the acoustic and lighting requirements of high-definition radio and television production. For a broadcasting organization, the radio studio area is where programs begin: acoustics determine microphone pickup and speech intelligibility, lighting determines the quality of on-camera images, and electrical systems ensure reliable operation. All three are essential. This is why the acoustic, lighting and electrical works were tendered and constructed as one integrated package.


2. The Past: The 2015 Design Blueprint

2.1 Design Approach: Three Core Disciplines—Acoustics, Lighting and Electrical Systems

The design phase was built around three core disciplines: acoustics, lighting and electrical systems. For acoustics, the design followed GY/T 5086-2012, Acoustic Design Specifications for Radio and Television Recording (Broadcasting) Rooms and Studios, setting requirements for reverberation time and background noise in announcer and live broadcast rooms. The wall finishes combined slotted wood perforated acoustic panels, flame-retardant decorative acoustic panels and upholstered acoustic surfaces, complemented by an acoustic ceiling to control sound absorption. For lighting, illuminance, color-temperature consistency and color rendering index (Ra) were checked against GY 5045-2006, Design Specifications for Television Studio Lighting Systems, including its mandatory provisions. Three-primary-color soft lights were used to create an even, diffused lighting environment. For electrical works, power distribution, integrated cabling and luminaire installation followed GB 50303-2015. These three disciplines converged in one coordinated set of detailed drawings rather than being designed independently by separate subcontractors.


2

Figure 2. Floor Plan: Layout of the Technical Rooms and Shared Areas in the Media Center Radio Studio Area (Design Stage)


2.2 Live Studio Cluster: A Room-by-Room Approach Centered on Speech Intelligibility

Radio broadcasting is primarily speech-based, making speech intelligibility and low background noise its key acoustic objectives. In accordance with the reverberation-time and background-noise requirements of GY/T 5086-2012, Saijia controlled the sound absorption and sound insulation assemblies in each live studio. Wall finishes combined slotted wood perforated acoustic panels, flame-retardant decorative acoustic panels and upholstered acoustic surfaces, together with an acoustic suspended ceiling, to bring reverberation time within a suitable range for speech broadcasting. The broadcast positions were arranged around curved desks to prevent microphones from facing highly reflective surfaces. The design renderings below show the green acoustic walls, curved broadcast desk and circular illuminated ceiling—an intuitive expression of an approach that prioritizes sound absorption and uniform, diffused lighting.


3

Figure 3. Design Rendering: Radio Live Studio—Green Acoustic Walls, Curved Broadcast Desk and Circular Illuminated Ceiling


4

Figure 4. Design Rendering: Live Studio (News and Variety Show Mode)—Background Screen and Lighting Atmosphere


5

Figure 5. Design Rendering: Live Studio (Traffic and Economics Mode)—Program-Specific Visual Design and Lighting


2.3 Multi-Purpose Live Studio and Multi-Mode Switching

The multi-purpose live studio is the functional hub of the room cluster. It can host live news broadcasts and switch to variety shows or special-program recording. The LED background screen, lighting scenes and directing operations were planned together, allowing the same space to be reconfigured quickly for different program formats. The design rendering illustrates the overall appearance of the multi-purpose studio. Acoustic wall treatments, lighting suspension and the background screen were integrated from the outset, avoiding later drilling for lights or screens that could compromise the sound insulation layer.


6

Figure 6. Design Rendering: Multi-Purpose Live Studio—Integrated Acoustic Walls, Lighting Suspension and Background Screen


2.4 Directing Room and Master Control Room: Spaces with Long Occupancy and Demanding Listening Requirements

The directing room and control room are spaces where staff spend extended periods and listening requirements are particularly demanding. The design focused on three aspects: controlling low-frequency standing waves and room coloration in small rooms, while keeping mid-frequency reverberation at an appropriate level and maintaining a flat frequency response; installing sound-insulating observation windows using two panes of glass of different thicknesses, mounted at an angle with resilient frame seals, so that the window's sound insulation matched that of the wall; and maintaining left-right symmetry in the monitoring environment, with acoustic treatments, doors, windows and equipment racks arranged symmetrically around the centerline to prevent image shift. The design renderings show the spatial layouts of the directing and master control rooms, with the sound-insulating observation windows and acoustic wall treatments serving as the most visible features of the acoustic design.


7

Figure 7. Design Rendering: Directing Room—Large Sound-Insulating Observation Window and Acoustic Wall Treatments


8

Figure 8. Design Rendering: Master Control Room—Monitoring Environment and Sound-Insulating Observation Window Design


3. Pre-Construction Preparation: Managing Risks Before Work Begins

3.1 Overall Coordination for Construction in an Operating Broadcasting Building

Building 1 of the Media Center, where the project was located, was an active broadcast technology facility. Construction therefore had to be scheduled around ongoing broadcasts. The project team first established an overall plan organized by zones, phases and time slots. Work began in rooms physically isolated from operating studios. High-noise activities such as cutting and chiseling were scheduled only during permitted periods and coordinated with the station's operating schedule. Materials were transported along designated routes to avoid peak broadcast periods. This coordination continued throughout the project and was the first practical step toward keeping broadcasts on air while minimizing disruption.


3.2 Detailed Design and Delivery of Materials and Equipment

Before construction began, the acoustic assembly drawings, lighting suspension drawings and electrical layout drawings were completed and reviewed across disciplines, minimizing on-site changes by resolving interfaces at the drawing stage. Acoustic materials—including slotted wood perforated acoustic panels, flame-retardant decorative acoustic panels and upholstered acoustic finishes—along with lighting suspension components, distribution boxes and integrated cabling trays, were delivered in batches according to the construction sequence. Technical briefings were provided to the teams responsible for wooden door installation, doors and windows, lighting fixtures, switches and sockets, distribution boxes and internal wiring, and integrated cabling. These briefings translated requirements such as those in GB 50303 into specific work practices. Consistent implementation at the team level was essential to consistent workmanship.


3.3 Coordinated Construction Interfaces for the Six Subsystems

The project comprised six subsystem work packages covering all technical spaces in the radio studio area. Architectural acoustic treatments were renewed in all four types of technical rooms—live broadcast studios, recording studios, directing rooms and control rooms—while the television lighting and suspension systems were installed in parallel, with electrical works, including integrated cabling and power distribution, completed as supporting systems. Two features stand out. First, acoustic renovation was the main workstream, with all four room types receiving new architectural acoustic treatments. Second, the lighting team worked concurrently: detailed television lighting design was completed alongside the acoustic renovation, allowing construction and commissioning to be completed in one coordinated phase and avoiding a second mobilization that could damage finished acoustic assemblies.


4. Key Construction Challenges: Five Critical Work Areas in the Radio Studio Project

4.1 Coordinated Work Across Multiple Rooms: Integrating Acoustic and Lighting Installation

The project involved multiple disciplines, including architectural acoustics, television lighting and electrical engineering. Saijia used the coordinated detailed design drawings as the common interface for all teams. Lighting suspension components were embedded and conduits installed before the acoustic assemblies were closed. After closure, work was limited to finish layers and luminaire installation, avoiding rework and additional openings that could damage sound insulation. Completing and commissioning all rooms within approximately 200 days depended on this sequence: install embedded components first, close the assemblies next, and then complete the finish layers.


4.2 Acoustic Sealing Details Determine the Outcome: Inspecting Every Opening, Door and Window

In multi-room renovations, acoustic performance is often lost through small details. Conduit penetrations through walls, air-conditioning outlets and gaps around doors and windows can all become sound leakage paths. Every wall penetration was sealed and individually inspected. Acoustic doors received drop seals along their bottom edges, and resilient material was fully packed between the observation-window glass and its frame. Reverberation time was measured and verified in accordance with GY 5022-2007, Measurement Specifications for Reverberation Time in Radio and Television Announcer (Studio) Rooms. Ultimately, both sound insulation and room acoustics must be demonstrated through actual measurements.


4.3 Five Major Challenges and Their Solutions

The project's construction challenge register identified the risk points one by one and established corresponding controls. The following table summarizes the five major challenges and solutions confirmed by the construction records:


No.

Key Challenge

Challenge Analysis

Solution

1

Ensuring the Sound Insulation Performance of Lightweight Walls

The project involved specialized broadcasting processes and stringent acoustic requirements. The most critical factor was controlling the integrity of the sound-insulating wall assembly.

Construct the sound-insulating assembly strictly in accordance with the detailed design and specified methods. Implement acoustic breaks, sealing and properly matched doors and windows to get the sound-insulation details right the first time.

2

Workmanship of Specialist Acoustic Doors

Door joints and frames are potential sound leakage paths. Poor workmanship can compromise the sound insulation of the entire wall.

Apply proven manufacturing and installation practices, with strict quality control. Properly treat joints, frames and other vulnerable areas in accordance with broadcasting-industry requirements.

3

Sound Insulation of the Raised Vibration-Isolation Floor Base

Noise transmitted upward through the floor slab from the level below can interfere with radio program recording and broadcasting.

Use damping materials and multiple material layers to form an integrated sound-insulating assembly in accordance with broadcast-grade requirements, effectively reducing structure-borne sound transmission through the floor slab.

4

Control of Indoor Reverberation Time

The acoustic quality of broadcast technical rooms is largely determined by reverberation time, making it a key project control point.

Use reverberation-time calculations, acoustic software simulations and subjective evaluation checkpoints during construction to create a high-standard acoustic environment.

5

Coordination Between the Ceiling and Equipment

If large openings such as return-air outlets, ceiling penetrations, or reinforcement around suspension rods and ceiling framing are handled incorrectly, the sound-insulating layer and ceiling safety may be compromised.

Determine opening locations with the equipment trades in advance. Interrupt the ceiling assembly at these locations or install equipment before closing the openings. Make small openings through the ceiling as required, and reinforce suspension rods and framing around larger openings.


The first four items—lightweight sound-insulating walls, specialist acoustic doors, raised vibration-isolation floors and reverberation-time control—all serve the same objective: achieving reliable broadcast-grade sound insulation and acoustic quality. The fifth item, the interface between the ceiling and equipment, addresses potential conflicts between acoustic assemblies and building services before they arise. Notably, none of these challenges can be solved simply by purchasing better equipment; they all depend on workmanship and project management.


9

Figure 9. Design Rendering: Recording/Live Studio—Visual Reference for the Acoustic Observation Window and Acoustic Wall Treatment


5. Completion: Acoustic Renovation and Television Lighting Delivered as an Integrated Whole

5.1 Completed Project: From Design Blueprint to the Finished Space

At completion, the architectural acoustic treatments in all four types of technical rooms, the television lighting system and the supporting electrical works were all in place. The photographs below show the live studios, directing rooms and recording control rooms in the radio studio area. All were taken on site after completion and acceptance. The green acoustic walls, curved broadcast desks, circular illuminated ceilings, large sound-insulating observation windows and slotted wood acoustic walls bring the original design drawings to life. Here, acoustic performance and interior finishes work together, meeting broadcasting-industry requirements while creating a modern broadcast technology environment.


10

Figure 10. Completed Project (On-Site Photograph After Completion and Acceptance): Overall Appearance of the Technical Rooms in the Radio Studio Area


11

Figure 11. Completed Project: Green Acoustic Walls and Curved Broadcast Desk in the Live Studio


12

Figure 12. Completed Project: Large Sound-Insulating Observation Window and Blue Slotted Wood Acoustic Walls in the Live Studio/Directing Area


13

Figure 13. Completed Project: Uniformly Illuminated Ceiling in the Live Studio/Directing Area, Providing Diffused Lighting for Television Production


14

Figure 14. Completed Project: Wood-Finish Slotted Acoustic Walls and Sound-Insulating Observation Window in the Recording Control Room


15

Figure 15. Completed Project: Acoustic Noise-Reduction Treatment in the Public Corridor of the Radio Studio Area


16

Figure 16. Completed Project: Acoustic Assemblies and Finished Edges Around the Lighting Suspension System in a Technical Room


17

Figure 17. Completed Project: Panoramic View of the Finished Radio Studio Area


6. Acceptance and Handover: Verified Through Measurements and Actual Operation

6.1 Item-by-Item Verification of Reverberation, Sound Insulation and Electrical Systems

A separate scanned copy of the project's final acceptance report was not retained. The handover record is therefore based on integrated system commissioning, acoustic measurements and actual operation, as documented. Reverberation time in each technical room was measured using the method specified in GY 5022-2007, while background noise and sound insulation were checked against the design requirements. For the electrical works, insulation resistance tests were performed on power distribution circuits using a 500 V megohmmeter, in accordance with GB 50303-2015 and the technical briefing requirements, and the relevant technical records were retained. For broadcasting users, the ultimate test of a radio studio area is its sound: speech intelligibility, freedom from hum and coloration, and the absence of sound leakage when doors are opened were all checked during actual operation.


6.2 What Should Be Checked When Accepting a Radio Studio Project?

Acceptance of an integrated acoustic, lighting and electrical project involves more than confirming that the equipment can be switched on. Acoustic inspections should verify construction details and sealing, and measure reverberation time and background noise. Lighting inspections should verify illuminance, color-temperature consistency and suspension safety. Electrical inspections should verify insulation and grounding. Without measurement data, it is impossible to determine objectively whether the results meet the requirements. This is why acoustic performance criteria and testing requirements should be clearly specified in tender documents.


7. The Present: Day-to-Day Operation in an Active Broadcasting Building

After being put into service, the Media Center radio studio area quickly became a core production venue for Huzhou Radio and Television Station. Live news broadcasts, program recording and directing operations take place here in succession, with the acoustic renovation and television lighting systems supporting the station's demanding daily radio and television production. To ensure long-term stable operation, quarterly inspections and annual professional testing are recommended. Acoustic assemblies should be checked regularly for seal integrity and the condition of sound-absorbing finishes, with any deterioration repaired promptly. Lighting inspections should cover luminaire heat dissipation, dimming circuits and suspension points to prevent flicker and color shifts. Electrical circuits should undergo periodic insulation resistance testing in accordance with the technical briefing requirements, with records retained. This maintenance routine is key to turning a successfully completed acoustic renovation into a broadcast technology facility that remains reliable for years.


8. FAQ: Seven Common Questions About Acoustic Renovation of Radio Studios

Q: How does acoustic renovation of a radio studio differ from ordinary interior decoration?

A: Ordinary interior decoration focuses on appearance. Acoustic renovation of a live studio focuses on three measurable performance criteria: reverberation time, sound insulation and background noise. Acoustic assemblies, sound-insulating doors and windows, and the sealing of penetrations must be designed and installed in accordance with standards such as GY/T 5086-2012. Acceptance should be based on measured data rather than subjective listening.


Q: How long does a project involving a group of radio studios and recording rooms usually take?

A: Acoustic renovation of a single live studio typically takes one to two months. A multi-room project like this one, involving live studios, recording studios, directing rooms and control rooms, together with television lighting and electrical systems, generally takes about six months. This project began on May 22, 2015 and was completed on December 8, taking approximately 200 days. Key factors affecting the schedule include the number of rooms, the condition of the existing building and the restrictions involved in working inside an operating broadcasting facility.


Q: Why does a live studio need a sound-insulating observation window?

A: Directors and recording engineers need to see what is happening inside the live studio without repeatedly opening the door, which would compromise sound insulation. A sound-insulating observation window uses two panes of glass of different thicknesses with resilient seals to provide visibility while limiting sound transmission. It is standard equipment for live studios and recording studios and was also used in the recording control room in this project.


Q: How does television studio lighting differ from ordinary lighting in a radio studio area?

A: Television lighting is subject to specific requirements for illuminance, color-temperature consistency and color rendering index (Ra), as referenced in GY 5045-2006. Fixtures are suspended from a dedicated system and can be adjusted in angle. Ordinary lighting merely provides general visibility; it may cause color casts and harsh facial shadows, and its color temperature may not match that of an LED screen in the same shot.


Q: Why must a television lighting suspension system use specialist suspension equipment?

A: Studio lights remain suspended above personnel for long periods, so failure of a suspension component can cause a serious safety incident. Saijia's independently developed patented suspension equipment, including constant-force suspension rods, provides smooth lifting and reliable locking. Each point is checked for secure locking and load-bearing capacity after installation. These requirements cannot be reliably met by an ordinary interior fit-out contractor.


Q: How can you tell whether a company specializing in radio studio acoustic renovation is professional?

A: Consider four points: whether it has comparable projects for radio stations, television stations and recording studios; whether it understands broadcasting-industry standards and follows them during construction and acceptance; whether it can provide integrated detailed design for acoustics and lighting; and whether it has its own acoustic materials and suspension-system technology. Guangzhou Saijia Acoustics & Lighting Engineering Co., Ltd. has worked in the industry for more than 20 years. Its radio studio and recording studio project portfolio includes numerous broadcasting organizations, such as Guangdong Radio, Guangxi Radio and Yinchuan News Media Group.


Q: What should be done if the budget for acoustic renovation of a radio studio is limited?

A: Prioritize sound insulation and noise control. First secure the less reversible elements: sound-insulating walls, acoustic doors, observation windows and sealed penetrations. Sound-absorbing finish layers can be implemented in phases. For lighting, first meet the illuminance and color-temperature requirements at broadcast positions; decorative lighting can be added later. It is advisable to have a specialist company conduct a site survey and detailed design before deciding on a phased implementation plan.


9. Pitfall Guide: Seven Common Mistakes in Radio Studio Acoustic Renovation

Pitfall: Treating acoustic renovation of a live studio as ordinary interior decoration

Reality: Ordinary fit-outs are judged by appearance, while acoustic renovations are assessed using NRC (Noise Reduction Coefficient), STC (Sound Transmission Class) and reverberation time. Professional acoustic calculations are required. If unsuitable materials are used, the finished room may become an “echo chamber,” and correcting the problem later can be difficult.


Pitfall: Using the same design for both live studios and recording studios

Reality: Speech intelligibility is the priority in a live studio, while a recording studio also requires higher sound insulation and lower background noise. Different room types in the same facility have different acoustic objectives, so each room needs a tailored design.


Pitfall: Assuming ordinary double-glazed glass is sufficient for an observation window

Reality: Two panes of ordinary double glazing with the same thickness can create coinciding sound-insulation weaknesses at certain frequency bands. A professional sound-insulating observation window uses glass panes of different thicknesses, resilient mounting and sound-absorbing infill within the frame. This helps the window achieve sound insulation compatible with the wall; otherwise, a single window can undermine the performance of the entire wall.


Pitfall: Letting any interior fit-out contractor install television lighting

Reality: Television lighting involves verification of illuminance, color temperature and color rendering index, as well as suspension safety. Detailed design, installation and commissioning should be carried out by a professional team familiar with GY 5045-2006. It should not be treated as ordinary lighting installation.


Pitfall: Using ordinary hooks to secure the lighting suspension system

Reality: Suspension components carry loads over long periods above personnel. Dedicated suspension rods and locking mechanisms must be used, and every point must be inspected and accepted after installation to prevent luminaires from falling.


Pitfall: Skipping testing after acoustic renovation because the room sounds fine

Reality: Reverberation time, background noise and sound insulation must be measured and accepted in accordance with standards such as GY 5022-2007. Subjective listening cannot replace instrument-based measurements. The measurement report also provides a reference for future maintenance and dispute resolution.


Pitfall: Choosing a specialist subcontractor solely because it offers the lowest price

Reality: Low-cost work may involve non-standard suspension rods, poor-quality acoustic insulation and omitted sealing steps. The resulting rework and safety risks can far outweigh the price difference. It is safer to choose a specialist company with relevant project experience and proprietary technology.


10. Applicable Standards: Reference List for Radio Studio Area Projects

Acoustic renovation and television lighting projects for radio studio areas span several disciplines, including architectural acoustics, television lighting, electrical engineering and fire safety. Design and acceptance should therefore refer to the applicable national and broadcasting, film and television industry standards. The editions listed below serve as general references for the design, construction and acceptance of similar projects:


Standard No.

Standard Title

GY/T 5086-2012

Acoustic Design Specifications for Radio and Television Recording (Broadcasting) Rooms and Studios

GY 5022-2007

Measurement Specifications for Reverberation Time in Radio and Television Announcer (Studio) Rooms

GY 5045-2006

Design Specifications for Television Studio Lighting Systems (Including Mandatory Provisions)

GY/T 5043-2013

Indoor Environmental Requirements for Technical Rooms in Radio and Television Centers

GB/T 15508-1995

Acoustics—Methods for Testing Speech Intelligibility

GB/T 50356-2005

Code for Architectural Acoustical Design of Theaters, Cinemas and Multi-Use Auditoriums

GB 50118-2010

Code for Design of Sound Insulation of Civil Buildings

JGJ 57-2016

Code for Design of Theater Buildings (Chapter 9: Radio and Television Studios)

GB 50303-2015

Code for Acceptance of Construction Quality of Building Electrical Installations

GB/T 4959-2011

Methods of Measuring the Sound System Performance of Auditoriums (Monitoring and Sound Reinforcement Measurements)

GB/T 15734-2012

Limits and Measurement Methods of Electromagnetic Compatibility for Electronic Dimming Equipment

GB 50169-2016

Code for Construction and Acceptance of Grounding Installations in Electrical Installation Engineering

GB 50222-2017

Code for Fire Prevention Design of Interior Decoration of Buildings

GB 50016-2014

Code for Fire Protection Design of Buildings


11. Service Areas and Contact Information

Guangzhou Saijia Acoustics & Lighting Engineering Co., Ltd. specializes in acoustic and lighting engineering. Its work covers acoustic renovation and integrated acoustic, lighting and electrical systems for radio studio areas, recording studios, television studios, theaters, concert halls, auditoriums, lecture halls, gymnasiums and other venues. The company undertakes projects in China and overseas, with a focus on South China, East China, Central China and Southwest China. This project is a representative example of its work for a broadcasting organization in Huzhou, Zhejiang Province. From detailed design and construction inside an operating building without interrupting broadcasts to integrated system commissioning and operator training, the company provided a one-stop delivery service.


Tel: +86 20 8629 9208 | Address: Room 615, Building 3, No. 135 Huangyuan Road, Baiyun District, Guangzhou, China. If you are planning to build or upgrade a radio studio area, recording studio, television studio or multi-purpose venue, please contact us to discuss your project and obtain tailored recommendations.

Content Menu
CONTACT
Add: Room 615, Building 3, No. 135 Huangyuan Road, Baiyun District, Guangzhou City, Guangdong Province
E-mail: saijia.avl@gmail.com
Mobile: +86-13802436547,  +86-18600228211
INFORMATION
Sign up to receive our weekly newsletter
Contact us
Copyright © 2026 Guangzhou Saijia Acoustic & Lighting Engineering Co., Ltd. (SJAVL)