In Wushan, Tianhe District, Guangzhou, an area known for its concentration of universities, the Arts and Sports Center at the Wushan Campus of Guangdong Vocational College of Foreign Languages and Arts houses a professional concert hall with approximately 600 seats. The project progressed through a complete lifecycle: the design concept was established in 2011; Guangzhou Saijia Acoustics & Lighting Engineering Co., Ltd. won the project through an open tender organized by the Guangdong Provincial Government Procurement Center in July 2016; and the lighting and sound systems were procured, installed, completed and handed over in September of the same year. Following the timeline from design and pre-construction preparation to key construction work, completion and acceptance, this case study reviews the full development of a university concert hall's audiovisual engineering project and offers a reference for educational institutions and organizations planning concert halls, arts and sports centers, auditoriums or theaters.
Project Item | Details |
Project Name | Lighting and Sound System Procurement Project for the Concert Hall at the Arts and Sports Center, Wushan Campus, Guangdong Vocational College of Foreign Languages and Arts |
Project Location | Arts and Sports Center, Wushan Campus, Guangdong Vocational College of Foreign Languages and Arts, Wushan, Tianhe District, Guangzhou |
Owner | Guangdong Vocational College of Foreign Languages and Arts |
Contractor | Guangzhou Saijia Acoustics & Lighting Engineering Co., Ltd. |
Scope of Work | Procurement and installation of the concert hall stage lighting system, sound reinforcement system and related supporting facilities |
Start–Completion | July 29, 2016 – September 25, 2016 |
Venue Capacity | Approximately 600 seats; floor area: 869.16 m²; venue volume: approximately 4,800 m³ (according to the Arts and Sports Center's comprehensive design documents) |
The quality of a concert hall's acoustics is largely determined before construction begins. The origins of this project can be traced back to the Comprehensive Design Brief for the Gymnasium and Concert Hall, prepared in 2011, together with the associated cost estimates for the concert hall's lighting and sound systems. Developed alongside the building's architectural and structural design, these documents established the hall's acoustic positioning, lighting specifications and sound reinforcement architecture, providing the technical basis for the procurement and installation of the lighting and sound systems five years later.
The design documents specify approximately 600 seats, a floor area of 869.16 m², a total volume of approximately 4,800 m³, an audience-area volume of approximately 3,177 m³, and an average volume of approximately 6.3 m³ per seat. This figure falls within a reasonable range for a concert hall and provides a foundation for achieving a suitable sense of reverberation and loudness. The hall was intended to accommodate solo and ensemble instrumental performances, as well as small-scale productions, with natural-acoustic performances as its primary use.
Based on this emphasis on natural acoustics, the design incorporates numerous acoustic diffusers and reflectors to strengthen lateral reflections and sound richness. The target mid-frequency reverberation time (500–1,000 Hz) under full occupancy was set at 1.35 ± 0.1 seconds. A sound-ray analysis was also conducted based on the audience hall's basic geometry: the hall is 17 m wide, increasing to 23 m in the rear section. The relatively low lateral reflected energy in the middle-front seating area was addressed through adjustments to the side-wall angles and material layout. The design followed the standards applicable at the time: Code for Acoustical Design of Theaters, Cinemas and Multi-purpose Auditoriums (GB/T 50356-2005) and Code for Design of Theater Buildings (JGJ 57-2000; the current version is JGJ 57-2016).
The design documents specify tailored construction details for each surface in the audience hall. The stage features solid wood flooring over a vibration-isolation base. The audience area uses resilient flooring, while the aisles are covered with flame-retardant acoustic carpet to reduce footstep noise. The rear wall uses a broadband absorption structure consisting of light-gauge steel framing filled with 50 mm-thick, 32 kg/m³ ultra-fine glass wool and finished with flame-retardant, acoustically transparent CT fabric. The middle and rear side walls are angled to act as sound-reflecting surfaces, with a 40–300 mm cavity behind them to provide low-frequency absorption. A timber reflector ceiling above the proscenium provides early reflections to the front seating area. The audience area has a suspended ceiling made of approximately 25 mm-thick double-layer gypsum board. The audience seats, which account for the largest proportion of the hall's absorptive surfaces, were also evaluated separately for their sound absorption performance. This approach—controlling reverberation first and then optimizing sound quality—is one of the fundamental differences between a concert hall and a conventional auditorium.
The lighting specifications are clearly defined. At a camera aperture of f/5.6, the combined vertical illuminance of the front lighting and performance area must be no less than 2,000 lx. The stage color temperature is 3,050 ± 150 K, with a color rendering index of Ra ≥ 85 (continuous spectrum). Operating equipment must meet the NR25 noise criterion. The dimmer racks must also meet the Class 1 requirements for resistance to interference under the national standard Limits and Measurement Methods of Radio Disturbance Characteristics of Electronic Dimming Equipment.
According to the cost estimate, the lighting and control configuration includes 750 W profile spotlights (10°), 2 kW film-style floodlights, 2 kW spotlights, 1.25 kW double-reflector softlights for conference lighting, LED PAR64 fixtures, LED cyclorama lights and floor-mounted strip lights. The control system includes a 120-channel digital lighting console, a moving-light controller, 96-channel digital dimmer racks and a 60-channel non-dimmed power cabinet (6 kW per channel). Effects equipment includes 1.2 kW moving-head pattern fixtures, moving-head wash lights and a 2.5 kW followspot. An LED display for event titles is also provided. For stage machinery and curtains, the design includes six motorized lighting battens, each with four suspension points, a rated load of 4.0 kN and a lifting speed of 0.35 m/s, together with double-wrap hoists and a 16-channel batten control system, as well as fixed valance and horizontal curtain bars. This integrated system of luminaires, dimming and power distribution, effects equipment and suspension systems corresponds to the requirements of GB 50034, Standard for Lighting Design of Buildings; GY 5045-2006, Design Code for Lighting Systems in Television Studios; and GB 50303, Code for Acceptance of Construction Quality of Building Electrical Installations.
The sound reinforcement system was designed to Class 1 requirements for multi-purpose sound reinforcement systems under GB 50371-2006, Code for Design of Sound Reinforcement Systems in Halls. The specified targets include a maximum sound pressure level of ≥103 dB, sound field non-uniformity of less than 6 dB, and an overall system noise level of NR-20. The four key acoustic performance parameters—maximum sound pressure level, transmission frequency response, sound field non-uniformity and sound transmission gain—would later serve as the principal criteria for acceptance testing.
The system uses a left-center-right three-channel main PA configuration, supplemented by sound-image localization speakers, stage-lip speakers, fixed and mobile stage monitors, control-room monitors and an intercom system. The core equipment chain comprises a Soundcraft GB8 48-channel mixing console (with backup power supply), JBL AM Series three-way main PA and monitor speakers, CROWN Series power amplifiers, a BSS 8 × 8 digital matrix media processor, LEXICON effects processors and DBX equalizers. The microphone system includes SHURE UHF wireless microphones (handheld, headset and lavalier), professional gooseneck conference microphones, dynamic microphones and an automatic mixer. Audio sources include professional CD players and MD recorders/players. This classic signal chain—mixing console, digital processing, power amplification and loudspeakers—remains a widely used approach for sound reinforcement in university theaters.
On July 14, 2016, the Guangdong Provincial Government Procurement Center issued the Notice of Award (Yue Zheng Cai Han [2016] No. 51256J-2). Guangzhou Saijia Acoustics & Lighting Engineering Co., Ltd. won the open tender for the Concert Hall Lighting and Sound System Procurement Project at the Arts and Sports Center, Wushan Campus, Guangdong Vocational College of Foreign Languages and Arts (Procurement No. GPCGD161156HG256J), with a bid amount of RMB 1,485,420.59. Work commenced on July 29, 2016, and the project entered the implementation phase.
In August 2016, the project team completed eight technical briefings covering installation work: cable trunking installation, wiring in conduits, electrical cable laying, cable-end preparation and termination, distribution-box installation, internal distribution-box wiring, installation of luminaires, switches and socket outlets, and integrated cabling. Although lighting and sound projects may appear to be mainly about installing equipment, electrical and cabling work accounts for a substantial proportion of the actual workload. Translating each relevant acceptance requirement, including those in the Code for Acceptance of Construction Quality of Building Electrical Installations, into clear briefing points—and ensuring that every crew receives the briefing before starting work—provides a fundamental safeguard for completing government procurement projects on schedule and passing acceptance on the first attempt.
Lighting battens, loudspeaker suspension points, power distribution and signal routes all compete for space with acoustic ceilings, timber wall finishes and seating. Before construction, the project organized a coordinated drawing review involving the cabling and interior-fit-out teams. The teams jointly planned cable routes and reserved equipment locations, while clarifying the interfaces and sequence of work. Thorough coordination at this stage helps minimize rework during subsequent overlapping construction activities.
Challenge analysis: Equipment cabling and interior finishing involve extensive overlapping work. Conflicts may arise in cable routes and reserved installation points, affecting both the construction schedule and the finished appearance. Lighting cable trays must avoid the angles of the acoustic ceiling reflectors; loudspeaker signal cables must be routed separately from high-voltage lighting power cables to prevent interference; and no interior components may obstruct the travel range of the motorized battens.
Solution: Before construction, the cabling and interior-fit-out teams conducted a coordinated drawing review to align cable routes, reserved locations and work interfaces. Inspections were carried out alongside construction to prevent damage caused by overlapping activities. Concealed work was completed, inspected and closed in stages, avoiding rework caused by discovering missing conduits or cables only after ceilings or walls had been closed.
Challenge analysis: After renovation, the hall needed to achieve the acoustic performance expected of a professional concert hall, requiring precise commissioning and strict compliance with technical criteria. Natural acoustics remain the priority in the audience hall, while the sound reinforcement system must support solo and ensemble performances, conferences and popular music events. Finding the right balance is challenging: the system must preserve the hall's natural reverberation and sound richness while ensuring that amplified sound remains clear and free from distortion.
Solution: Professional commissioning engineers were assigned to tune the sound system in accordance with the hall's spatial acoustic characteristics, with acoustic optimization adjustments provided where necessary. Commissioning focused on four performance parameters: maximum sound pressure level, transmission frequency response, sound field non-uniformity and sound transmission gain. The digital processor was used for zone-based equalization, delay alignment and feedback suppression to achieve even coverage and consistent imaging across the left, center and right channels, with particular attention paid to preventing acoustic feedback.
The area above the stage contains numerous suspended components. Motorized lighting battens, luminaires and loudspeaker rigging hardware must all be checked for suspension-point loads and anti-loosening measures. Cables must comply with the design, using flame-retardant flexible power cables and dedicated DMX-512 signal/control cables. Cable trays, supports and hangers must be secured at the specified intervals. Distribution boxes, terminal boxes and socket boxes must be installed according to the drawings and individually labeled. Work at height must comply with the Technical Code for Safety of Working at Height in Building Construction, while temporary electrical installations must comply with the Technical Code for Safety of Temporary Electrical Use on Construction Sites. For university projects, the summer vacation is the key construction window: the project must be handed over before the September semester begins, making reverse scheduling and overlapping work sequences standard practice.
The project was completed on September 25, 2016. The completed venue features neatly arranged red audience seats; profile spotlights, softlights and floodlights installed on the lighting battens above the proscenium and stage in accordance with the lighting plan; and main PA speakers suspended on both sides of the stage. The timber-tone linear acoustic ceiling and the diffusive/absorptive wall structures are also fully in place. The lighting and sound systems are seamlessly integrated with the building's architectural acoustic finishes. Following handover, the concert hall became a core facility of the Wushan Campus Arts and Sports Center, supporting teaching, performances, conferences and arts practice.

Completed concert hall auditorium: stage lighting rigging and timber-tone acoustic walls

Completed stage area: proscenium lighting system and main PA speakers on both sides

Completed audience seating area (approximately 600 seats)

Rear-side view of the completed audience area: acoustic ceiling and diffusive/absorptive wall surfaces
Acceptance of government procurement projects requires complete documentation, compliance with performance criteria and a closed-loop process. For this lighting and sound system procurement project, the acceptance sequence included: sectional inspection of concealed works (cable trays, conduit wiring and cable laying) → equipment unpacking and inventory, followed by individual power-on checks → system commissioning and integrated testing → acoustic performance measurements → handover of completion documentation and user training.
The sound reinforcement system was tested against the Class 1 multi-purpose system requirements of GB 50371-2006, Code for Design of Sound Reinforcement Systems in Halls. Measurements followed GB/T 4959-2011, Methods of Measurement for the Acoustical Characteristics of Sound Reinforcement in Halls, and the acceptance procedure referred to GB/T 28048-2011, Code for Acceptance of Sound Reinforcement Systems in Halls and Sports Venues. Maximum sound pressure level under unoccupied and occupied conditions, transmission frequency response, sound field non-uniformity, sound transmission gain and overall system noise level were measured individually and documented for reference. Stage lighting was checked against the design documents for front-lighting and performance-area vertical illuminance, color temperature and color rendering index. Electrical installation work was inspected in accordance with GB 50303, Code for Acceptance of Construction Quality of Building Electrical Installations. The actual measured values of each parameter should be taken from the project completion and acceptance records; no values have been assumed or added in this article.
Q: What systems are generally included in a concert hall lighting and sound project?
A: A complete concert hall lighting and sound system typically includes a professional stage lighting system (front light, side/front-of-house light, side light, top light, cyclorama and floor-mounted strip lights, moving effects lights and followspots); a dimming and power distribution system (lighting console, dimmer racks, non-dimmed power cabinets and low-voltage distribution cabinets); a sound reinforcement system (left, center and right main PA, sound-image localization speakers, stage-lip speakers, stage monitors, control-room monitors, digital processors, and wired and wireless microphones); an LED event-title display; and stage machinery such as motorized lighting battens and curtains. This project was procured and installed according to the architecture defined in the comprehensive design documents.
Q: Why is sound reinforcement in a concert hall different from that in an auditorium?
A: Concert halls are primarily intended for natural-acoustic performances. The sound reinforcement system is designed to supplement the sound and extend coverage without compromising the hall's original sound field. By contrast, auditoriums are generally designed for speech reinforcement, with intelligibility as the main priority. For concert halls, the relevant acoustic performance parameters under GB 50371-2006—maximum sound pressure level, transmission frequency response, sound field non-uniformity and sound transmission gain—must be controlled. Loudspeaker selection, aiming angles and commissioning therefore require greater attention to detail.
Q: How does a reverberation time of 1.35 seconds affect lighting and sound system construction?
A: Reverberation time is determined by the architectural acoustic absorption treatments. During construction, sound-absorbing materials must not be replaced or removed arbitrarily, and equipment must not be added to reflectors or diffusers in ways that alter their angles. Lighting fixtures and loudspeaker suspension points must be coordinated with the acoustic surfaces and positioned to avoid interference. Otherwise, the hall's acoustic performance may be changed directly, causing the reverberation time to deviate from the design target.
Q: How are lighting and sound projects under government procurement generally accepted?
A: Equipment brands, models and quantities are checked against the procurement contract and tender response documents. Once the concealed-work records, commissioning logs and test reports are complete, the system is assessed against the criteria in GB 50371-2006, measured using the methods in GB/T 4959-2011 and accepted with reference to the procedures in GB/T 28048-2011. Third-party testing may be commissioned when necessary. The process concludes with document handover and operational training.
Q: How is the safety of lighting battens and suspended loudspeakers ensured?
A: Safety relies on three measures. First, engineering calculations must define the number of suspension points and the load at each point (the motorized battens in this project used four suspension points and had a rated load of 4.0 kN). Second, hoists, lighting hooks and rigging hardware must have anti-loosening and anti-detachment measures. Third, every point must be inspected after installation, followed by regular inspections and maintenance during operation. Safety always takes priority over performance when equipment is suspended above an audience.
Q: What is the approximate cost of a concert hall project at a university arts and sports center?
A: Cost is closely related to seating capacity, hall volume and system specification. The awarded amount for the procurement and installation of the lighting and sound systems in this approximately 600-seat concert hall was RMB 1,485,420.59. This can serve as a reference point for the electroacoustic systems of university concert halls of a similar scale. If architectural acoustic finishes, stage machinery or other works are included, the budget must be calculated separately according to the project scope.
Q: How should universities in Guangzhou and South China choose a contractor for a concert hall project?
A: Four factors deserve particular attention: experience with comparable university theaters and concert halls; tender-award and contract-performance records for government procurement projects; familiarity with acoustic and acceptance standards; and the availability of an in-house commissioning team. In this case, Guangzhou Saijia Acoustics & Lighting Engineering Co., Ltd. won the contract through an open tender organized by the Guangdong Provincial Government Procurement Center and completed procurement, installation and commissioning within the construction window before the new semester.
Misconception 1: A concert hall is just a larger auditorium, so architectural acoustics are not important.
A: Concert halls are primarily designed for natural-acoustic performances. Reverberation time, sound diffusion and early reflections form the foundation of sound quality. Without proper architectural acoustics, even the most expensive sound system cannot compensate. The correct approach is to integrate acoustic design with the architectural and interior design from the outset, checking the room geometry, materials and seating one by one.
Misconception 2: Finish the ceilings and walls first, then install the cable routes.
A: If ceilings and walls are closed before the overlapping work is coordinated, later cable installation may damage the finished surfaces. The correct approach is to review the drawings first, coordinate cable routes and reserved installation points, and close concealed areas only after the relevant sections have been inspected and accepted.
Misconception 3: An impressive equipment list guarantees excellent performance.
A: System performance = equipment + design + commissioning + architectural acoustics. None can be omitted. Zone-based equalization, delay alignment and feedback suppression using the digital processor—and matching these settings to the hall's characteristics—often have a greater impact on the listening experience than spending tens of thousands of yuan on equipment upgrades.
Misconception 4: Acceptance simply means switching on the power, checking that the lights work and confirming that sound can be heard.
A: Proper acceptance requires measured results for maximum sound pressure level, transmission frequency response, sound field non-uniformity and sound transmission gain. Lighting must be checked for illuminance, color temperature and color rendering index. Checking only whether the system produces sound can leave problems undiscovered until the first performance after the semester begins.
Misconception 5: Ordinary cables can be used to save money.
A: Stage environments require cables with appropriate flame-retardant and shielding properties. Power cables should be flame-retardant types (such as ZR-RVV), while signal lines should use dedicated shielded cables and be routed separately from high-voltage power lines. Otherwise, signal interference and fire-safety risks may arise.
The main standards relevant to the design, construction and acceptance of this project are listed below. For standards cited in the original design documents, the versions in force at the time apply; the current versions are provided as general references for similar projects.
Category | Standard No. | Standard Title |
Sound Reinforcement | GB 50371-2006 | Code for Design of Sound Reinforcement Systems in Halls |
Sound Reinforcement | GB/T 4959-2011 | Methods of Measurement for the Acoustical Characteristics of Sound Reinforcement in Halls |
Sound Reinforcement | GB/T 28048-2011 | Code for Acceptance of Sound Reinforcement Systems in Halls and Sports Venues |
Sound Reinforcement | WH/T 25-2007 | Guidelines for Sound Reinforcement System Engineering in Theaters and Other Performance Venues |
Acoustics | GB/T 50356-2005 | Code for Acoustical Design of Theaters, Cinemas and Multi-purpose Auditoriums |
Theater Architecture | JGJ 57-2016 | Code for Design of Theater Buildings (Section 6.4: Stage Lighting; Section 6.5: Stage Sound) |
Stage Lighting | GB 50034 | Standard for Lighting Design of Buildings |
Stage Lighting | GY 5045-2006 | Design Code for Lighting Systems in Television Studios |
Stage Lighting | GB/T 14218 | Performance Parameters and Test Methods for Electronic Dimming Equipment |
Stage Lighting | WH/T 26-2007 | Photometric Testing and Labeling of Stage Lighting Fixtures |
Building Electrical | GB 50303-2015 | Code for Acceptance of Construction Quality of Building Electrical Installations |
Building Electrical | GB 50169 | Code for Construction and Acceptance of Grounding Devices in Electrical Installation Engineering |
Guangzhou Saijia Acoustics & Lighting Engineering Co., Ltd. undertakes lighting and sound system projects in China and overseas for concert halls, theaters, studios, multi-purpose halls, auditoriums, gymnasiums and other venues, with a focus on South, East, Central and Southwest China. In Guangzhou, we are familiar with the project requirements of universities in the Wushan area of Tianhe District—including South China University of Technology, South China Normal University and South China Agricultural University—as well as arts and sports centers, theaters and concert halls on university campuses. We provide end-to-end services covering scheme design, government procurement tender responses, system installation, acoustic commissioning and acceptance.